Belzona® Waterproofing On Alabamas Tallest Building

 
 

Industry:

Buildings & Structures (BSTR)

 
 

Application:

Roof Problem Areas (RPA)

 
 

Customer Location:

RSA Battle House Tower, Mobile, Alabama

 
 

Application Date:

May, 2007

 
 

Application Situation:

Floor penetrations for the main power lines from the ground floor to the top of the building

 
 

Problem:

The openings on each floor that allow the power lines to travel the length of the structure were subject to water penetration between the concrete floor and curb

 
 

Products:

Belzona® 3121 (MR7)
 

Substrate:

Concrete

 
 

Application Method:

The application was carried out in accordance with Belzona Know-How System Leaflet RPA-8

 
 

Belzona Facts:

Utilizing Belzona Know How and providing a detailed procedure for the repairs, the architect was confident that the building would be protected.

 
 

Photographs Description

  1. View of the Tower
  2. Close up of the Belzona® 3121
  3. View of the curbing
  4. An overview of the power lines
 