KHIA headerKnow-How in Action

VOL XXIII, NO 54

University Studies Belzona® Floor Solution

 
 

Industry:

Buildings & Structures (BSTR)

 
 

Application:

Centrifugal Pumps (CEP)

 
 

Customer Location:

University, St Louis, Missouri U.S.A.

 
 

Application Date:

Spring 2008

 
 

Application Situation:

Floor areas in service areas/boiler room. 

 
 

Problem:

Floor caused trip hazards for employees and previous coatings required annual refurbishment.

 
 

Products:

Belzona® 4111 (Magma Quartz)
Belzona® 5231 (SG Laminate)
 

Substrate:

Concrete

 
 

Application Method:

Application was carried out in accordance with Belzona Know How System Leaflets FPA-1 & -3.

 
 

Belzona Facts:

This had been a yearly repair and customer was looking for long term solution.

 
 

Photographs Description

  1. Floor before repairs and coating
  2. Close up of floor problems
  3. Holes in floor repaired with Belzona® 4111
  4. Floor after coating with Belzona® 5231
 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
For more information about Belzona visit: www.belzona.com