KHIA headerKnow-How in Action


Belzona® Refurnishes Schools Floor



Buildings & Structures (BSTR)



Floor Problem Areas (FPA)


Customer Location:

Cheltenham, UK


Application Date:

October 2010


Application Situation:

Floor of the corridor and kitchen of a private school



They had a few slips on the existing floor and requires a quick curing application which could be carried out within four days start to finish with no solvant smells.



Belzona® 5231 SG Laminate



Concrete with an existing coating unknown


Application Method:

Application was carried out in accordance with Belzona Know-How System Leaflet FPA-1. The application was carried out in three steps, mechanical abrasion, clean/degrease and then, two coats of Belzona® 5231.


Belzona Facts:

They required a seamless systems, solvent free with 10% aggregate to provide a positive grip system which is also chemical resistance and quick curing for less down time.


Photographs Description

Corridor prior to the application Kitchen prior to the application Corridor after application Kitchen after application  

Case study pic one


 Case study pic two


 Case study pic three


 Case study pic four


For more information about Belzona visit: