Application Situation:

Power Station Chimney Stack

 
 

Problem:

The concrete had become detiorated from the locally generated fumes and required protection.

 
 

Products:

Belzona® 5151 (Hi-Build Cladding)

 

Substrate:

Concrete

 
 

Application Method:

The application was carried out in accordance with a modified Belzona Know-How System Leaflet WPA-2. To reduce disruption Rope Access technicians were used to complete the application.

 
 

Belzona Facts:

In this particular case, the client required a blue/grey coating to meet their corporate needs. The Belzona® 5151 was modified to match the colours without deteriorating the performance of the coating which provides excellent protection whilst maintaining good appearance through its self cleaning properties.

 
 

Photographs Description

  1. Before application
  2. Application via rope access
  3. Close up of completed application
  4. General view of the protected stack
 
 
  View PDF version  
 
 