KHIA headerKnow-How in Action

VOL XXVI, NO 87, ELITE

Belzona® Rapid Repair To Viaduct Railing Support

 
 

Industry:

General Industry (GIND)

 
 

Application:

Floor Problem Areas (FPA)

 
 

Customer Location:

Town council, Canada

 
 

Application Date:

May 2003

 
 

Application Situation:

Pedestrian pavement beneath viaduct.

 
 

Problem:

The concrete base for railings support pillars was cracked and spalled.

 
 

Products:

Belzona® 4141 (Magma-Build)

 

Substrate:

Concrete and steel

 
 

Application Method:

Application was carried out in accordance with Belzona Know-How System Leaflet FPA-10.

 
 

Belzona Facts:

The application was achieved in 2 hours and without the need for any formwork. This application is still in excellent condition when inspected in 2011.

 
 

Photographs Description

Concrete condition before the application The concrete is coated with Belzona® 4911 Conditioner Belzona® 4141 application completed quickly and easily without the use of formwork

 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 

 

 
 
For more information about Belzona visit: www.belzona.com