BELZONA STOPS DAMAGE FROM OCCURRING AT NEW LOADING DOCK

KHIA ID: 354
Industry: General Industry (GIND)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Concrete
Customer Location: A welding supply customer
Application Date: September 1990
Products:

Belzona ® 4111 (Magma Quartz)


Problem: The welding supply firm knew that the edge of the loading dock at their new facility would experience damage from moving heavy gas cylinders on and off the trucks.
Photograph Descriptions
  1. The recessed area of the dock
  2. The area taped and conditioned
  3. Belzona ® 4111 (Magma Quartz) trowelled into place
Application Situation
A new loading dock edge.
Application Method
The application was carried out in accordance with Belzona Know-How System Leaflet FPA-1.
Belzona Facts
As this was new construction, a recess two feet wide and one quarter inch deep was left the entire length of the 20-foot long loading dock. After the concrete was fully cured, this area was cleaned and prepared with Belzona® 4911 (TX Conditioner). Belzona® 4111 (Magma Quartz) was then trowelled into place at the edge of the dock. The application was carried out based on the company’s previous experience with Belzona.