Long Lasting Belzona® Step Repair - Excellent After 20 Years

 
 

Industry:

General Industry (GIND)

 
 

Application:

Floor Problem Areas (FPA)

 
 

Customer Location:

U.S. Air Force Base - Illinois U.S.A.

 
 

Application Date:

Summer 1984

 
 

Application Situation:

Steps into busy headquaters building

 
 

Problem:

Cracked steps allowed water to leak and pool under the steps where the main building transformer is located. Of secondary concern was the absence of slip protection on the step noses.

 
 

Products:

Belzona® 4111 (Magma-Quartz)

Belzona® 1321 (Ceramic S-Metal)

Belzona® 9211 (Supergrip Aggregate)

 

Substrate:

Concrete

 
 

Application Method:

Application was carried out in accordance with Belzona Know-How System Leaflet FPA-8.

 
 

Belzona Facts:

All the steps and landings were rebuilt/coated with 1/4” of Belzona® 4111. Strips of Belzona® (Ceramic S-Metal) and coarse aggregate were applied for safety. Repouring of the steps would have been very expensive and most likely would have suffered the same problem after a period of time. After 20 years the steps and the non-skid are still in excellent condition. The photos were taken in April of 2004.

 
 

Photographs Description

1. to 4. Various angles of the steps.

 