KHIA headerKnow-How in Action


Belzona® Rebuilds Damaged Loading Bay



Buildings & Structures (BSTR)



Floor Problem Areas (FPA)


Customer Location:

Valve Manufacturer, Haywards Heath, UK


Application Date:

September 2014


Application Situation:

Damaged loading bay



The loading Bay to this factory has a gradient levelling off down at road level. When lorries load and unload they have to reverse from the road up the gradient and into the loading area.  At the start of the gradient lorries wheels lose traction causing abrasion and damage to the concrete. To overcome this, lorries take the run-up to the loading Bay, resulting in damage to the loading bay wall and potential injury to personnel. Over time the damage to the concrete slab has worsened making loading and unloading much more hazardous.



Belzona 4131 (Magma Screed)
Belzona 4911 (Magma TX Conditioner)





Application Method:

The application was carried out in accordance with Belzona Know How System .1. After surface preparation to remove any loose concrete, Belzona 4911 was applied to the entire area followed by a layer of Belzona 4131.


Belzona Facts:

The entire application was completed in one day, the quick cure time of Belzona 4131 meant the loading Bay could then be reopened the following day. Belzona 4131 provides excellent grip properties in both wet and dry conditions; it's excellent wear characteristics will ensure this is a long term solution.


Photographs Description

1. Damaged concrete 2. Incline of loading bay. 3. Completed Application 4. Completed Application