Belzona Saves Significant Downtime for Cement Plant

KHIA ID: 550
Industry: General Industry (GIND)
Application: MPT-Mechanical Power Transmission (MPT)
Substrate: Steel
Customer Location: Cement plant - United Arab Emirates
Application Date: May 2005
Products:

Belzona® 1121 (Super XL-Metal)


Problem: Bearing area of the 155mm shaft was down due to bearing failure, causing the entire operation to shut down.
Photograph Descriptions
  1. Surface preparation in progress
  2. Prepared surface, ready for Belzona to be applied
  3. Completed application
  4. General view of crusher shaft in operation after the application
Application Situation
Crusher shaft
Application Method
Application was carried out in accordance with Belzona Know-How System Leaflet MPT-1 and MPT-2.
Belzona Facts
An alternative method would be to weld and grind the shaft, but this is not possible in situ. Removal of the shaft from the equipment would require over 100 hours of downtime as no spare part was available. With Belzona, this customer was back up and running in hours, not days, saving significant amounts of money from lost production and downtime.