KHIA headerKnow-How in Action


Belzona® Resin Chocks For Dredger Boiler



Marine (MRNE)



Gaskets, Seals and Shims (GSS)


Customer Location:

Port Operator, Middlesbrough, UK


Application Date:

April 2015


Application Situation:

Boiler inside engine room of dredger.



A new boiler required chocking into place. A secure, vibration free location was essential to its efficient operation.  



Belzona 7111 (Marine Grade)





Application Method:

The application was carried out in accordance with Belzona Know-How System Leaflet GSS-12. The boiler was set into place using jacking bolts, and dams were built around each of the individual bolts. Belzona 7111 was then poured into the prepared areas using a small section of steel as a runway due to the difficult access. The thickness of the pour was just over 2 inches, so a solidifier reduction was used.


Belzona Facts:

The Belzona 7111 resin chocks were quickly and effectively installed and will ensure a secure, vibration free location for the boiler.


Photographs Description

  1. The boiler set in place
  2. Pouring Belzona 7111 into the prepared area
  3. Product curing around bolts
  4. Completed application with dams removed
Case study pic one


 Case study pic two


 Case study pic three


 Case study pic four


For more information about Belzona visit: