Belzona® Repairs Damaged Truck Scales

 
 

Industry:

General Industry (GIND)

 
 

Application:

Floor Problem Areas (FPA)

 
 

Customer Location:

Building materials manufacturer, Croatia

 
 

Application Date:

August 2016

 
 

Application Situation:

Truck scales operates 12+ hours per day, 6 days per week. Trucks loaded with raw materials and end products areweighed in and out all the time.

 
 

Problem:

The concrete surface of the scale suffered severe damage due to the heavy traffic, weather conditions and leaking of fuel, oil etc. Customer needed to address this problem, but due to intensive production it was impossible to put the truck scale out of use for more than a day or two. Belzona offered to repair the most damaged parts of the scale (where the reinforcement bars are exposed), as a first phase, with possibility to resurface the whole scale in the next phase.

 
 

Products:

Belzona 4111 (Magma Quartz)

 

Substrate:

Concrete

 
 

Application Method:

The application was carried out in accordance with Belzona Know-How System Leaflet FPA-1.

 
 

Belzona Facts:

Having in mind the fact that truck scale operates 6 days per week there are very few alternatives. Customer was considering building another truck scale beside the old one, but Belzona gave him a better solution.

 
 

Photographs Description

1. Damaged truck scale - overview 2. Detailed view on one of severely damaged areas 3. Application in progress 4. Completed application

 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
For more information about Belzona visit: www.belzona.com