BELZONA IN-SITU TANK REPAIR

KHIA ID: 972
Industry: General Industry (GIND)
Application: TCC-Tanks and Chemical Containment Areas (TCC)
Substrate: Mild steel
Customer Location: Automobile component manufacturer, UK
Application Date: December 2006
Products: Belzona® 1111 (Super Metal)
Belzona® 5811 (Immersion Grade)

Problem: Corrosion and leaking tank. To replace tank with new was costly and would result in production downtime of 7-10 working days.
Photograph Descriptions
  1. Tank cleaned and shot blasted
  2. Vacuum column prior to plate being bonded
  3. Remedial work/plates bonded in place
  4. Tank complete after 2 coats of Belzona® 5811
Application Situation
Paint booth process water tank
Application Method
Application was carried out in accordance with Belzona Know-How System Leaflets TCC-1 & -3. doubler plates were bonded over perforated steelwork before applying corrosion resistant coating.
Belzona Facts
The alternative method of replacing tanks with new was 3 times as expensive, and turnaround would have been 7-10 working days. Belzona method was complete within 24 hours with no interuption to production.