KHIA headerKnow-How in Action


Belzona® Fixes Pilot Boat Rubbing Strip



Marine (MRNE)


Áreas Know-How:

Ships and Offshore Structures (SOS)


Cliente / ubicación:

Marine company, Wales


Fecha de aplicación:

October 2008


Situación de aplicación:

Rubbing strip on Rigid Inflatable (RIB) pilot boat.



Due to the high cost of the new rubbing strip and the high cost of the boat being out of use, the client required a fast repair to put the boat back into service.



Belzona® 2211 (MP Hi build Elastomer)





Método de aplicación:

Application carried out in accordance with Belzona Know-How System Leaflet SOS-12. after preparing underside of rubbing strip and counterface on hull, the strip was positioned, spacers were used to ensure a level fit, and taped into place until Belzona cured.


Hechos Belzona:

The only alternative was to remove the complete rubbing strip from the boat tube and glue on a new one. This would have mean possible damage to the tube costing thousands of pounds.


Descripciones de fotografías

  1. The RIB pilot boat
  2. New D section rubbing strip ready to be bonded into place
  3. Strip being bonded into place
  4. New section bonded on and held in place with tape unti Belzona cured
Case study pic one


 Case study pic two


 Case study pic three


 Case study pic four


Para obtener más información acerca de los productos Belzona visite: