| Belzona Waterproofs Control Room Roof | | | Industry:Oil & Gas (OILG) | | | Application:Roof Problem Areas (RPA) | | | Customer Location:Oil Refinery | | | Application Date:May 1997 | | | Application Situation:Flat concrete slab roof over control room | | | Problem:Water penetration through various cracks and at equipment support pads. Leakage was also suspected through 120 linear meters of expansion joints. | | | Products:Belzona® 3111 (Flexible Membrane) | | | Substrate:Concrete | | | Application Method:Application was carried out in accordance with Belzona Know-How Leaflets RPA-1, RPA-2, RPA-6, RPA-8, RPA-10 and RPA-11. | | | Belzona Facts:No fewer than six different repair materials had been used previously, none of which had proved effective. Failure to waterproof the roof jeopardized the safe operation of the refinery. | | | Photographs Description
- The pneumatic scabbler used to prepare the roof surface
- Application underway with part of the roof conditioned and part coated with Belzona® 3111
- The completed application. Note the seamless finish achieved over the many equipment supports
| |
| |