BELZONA PROTECTS LOADING DOCK AND RIVER

KHIA ID: 1177
Industry: Chemical & Petrochemical (PETR)
Application: TCC-Tanks and Chemical Containment Areas (TCC)
Substrate: Concrete
Customer Location: Petrochemical Plant, South Louisiana U.S.A.
Application Date: July, 2001
Products:
Belzona® 2111 (D&A Hi-Build Elastomer)
Belzona® 4311 (Magma CR-1)

Problem: The concrete loading dock was suffering from chemical erosion and threatening to contaminate the river.
Photograph Descriptions
  1. Overview of dock and river
  2. Close-up of coating
  3. Overview of containment area
  4. Coating still resistant to standing caustic after 6 years service
Application Situation
Loading dock for Sodium Hydroxide (caustic) on banks of the Mississippi.
Application Method
The application was carried out in accordance with Belzona Know-How System Leaflets TCC-12, -7 and -15. Surface prepared by abrasive grit blast.
The entire dock was overcoated with Belzona® 4311. Expansion joints and seams were sealed with Belzona® 2111.
Belzona Facts
The customer is responsible for containment subject to governmental regulation and potential heavy fine due to the close proximity of the dock to the river. Belzona was able to prevent contamination of the environment. Application has been in service for 6 years, and is in excellent shape today.