| Belzona Seals Plant Room Floor | | | Industry:Buildings & Structures (BSTR) | | | Application:Centrifugal Pumps (CEP) | | | Customer Location:Hospital, UK | | | Application Date:May 2009 | | | Application Situation:Boiler plant room of a hospital | | | Problem:Water was leaking through the floor to the operating theatres below. | | | Products:Belzona® 5231 (SG Laminate) | | | Substrate:Concrete | | | Application Method:Application was carried out in accordance with Belzona Know How System Leaflet FPA-8. The floor was first diamond ground and then two coats of Belzona® 5231 (SG Laminate) applied. | | | Belzona Facts:The whole application was carried out over one weekend. The low odour, solvent free Belzona® 5231 did not impact on normal operating of the hospital. | | | Photographs DescriptionDamaged floor Belzona® 5231 application starting Completed application Completed application
| |
| |