Belzona® Refurnishes Schools Floor

 
 

Industry:

Buildings & Structures (BSTR)

 
 

Application:

Floor Problem Areas (FPA)

 
 

Customer Location:

Cheltenham, UK

 
 

Application Date:

October 2010

 
 

Application Situation:

Floor of the corridor and kitchen of a private school

 
 

Problem:

They had a few slips on the existing floor and requires a quick curing application which could be carried out within four days start to finish with no solvant smells.

 
 

Products:

Belzona® 5231 SG Laminate

 

Substrate:

Concrete with an existing coating unknown

 
 

Application Method:

Application was carried out in accordance with Belzona Know-How System Leaflet FPA-1. The application was carried out in three steps, mechanical abrasion, clean/degrease and then, two coats of Belzona® 5231.

 
 

Belzona Facts:

They required a seamless systems, solvent free with 10% aggregate to provide a positive grip system which is also chemical resistance and quick curing for less down time.

 
 

Photographs Description

Corridor prior to the application Kitchen prior to the application Corridor after application Kitchen after application  

 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
For more information about Belzona visit: www.belzona.com