| Belzona Rapid Repair To Viaduct Railing Support | | | Industry:General Industry (GIND) | | | Application:Floor Problem Areas (FPA) | | | Customer Location:Town council, Canada | | | Application Date:May 2003 | | | Application Situation:Pedestrian pavement beneath viaduct. | | | Problem:The concrete base for railings support pillars was cracked and spalled. | | | Products:Belzona® 4141 (Magma-Build) | | | Substrate:Concrete and steel | | | Application Method:Application was carried out in accordance with Belzona Know-How System Leaflet FPA-10. | | | Belzona Facts:The application was achieved in 2 hours and without the need for any formwork. This application is still in excellent condition when inspected in 2011. | | | Photographs DescriptionConcrete condition before the application The concrete is coated with Belzona® 4911 Conditioner Belzona® 4141 application completed quickly and easily without the use of formwork | |
| |