| Belzona Lobe Repairs Avoid Delays | | | | Industry:Water / Wastewater (WATR) | | | | Application:Positive Displacement Pumps (PDP) | | | | Customer Location:Water treatment plant, Canada | | | | Application Date:February 2001 | | | | Application Situation:Rotary lobe pumps used in waste water treatment plant. The lobes have a diameter of 70 cm and a thickness of 13 cm. | | | | Problem:the rubber lobes wear but there is a delay of 4-6 weeks for the delivery of these lobes. | | | | Products:Belzona® 2131 (D&A Fluid Elastomer) | | | | Substrate:Steel | | | | Application Method:The application was carried out in accordance with Belzona Know-How System Leaflet PDP-9. A mould, lined with Belzona® 1341 was created from new lobes and used to cast replica lobes using Belzona® 2131 around the steel centres which are grit blasted to achieve maximum adhesion. | | | | Belzona Facts:Many lobes have been produced using this process. This method is not cheaper but it reduces stock and saves a lot of production time by avoiding supply delays. | | | | Photographs Description
- Preparation of the mould coated with Belzona® 1341
- Lobe position in the mould
- The newly cast lobe in the mould
- The lobe is ready to be back in service.
| |
| |