| Belzona® Stops Damage From Occurring At New Loading Dock | | | Industry:General Industry (GIND) | | | Application:Floor Problem Areas (FPA) | | | Customer Location:A welding supply customer | | | Application Date:September 1990 | | | Application Situation:A new loading dock edge. | | | Problem:The welding supply firm knew that the edge of the loading dock at their new facility would experience damage from moving heavy gas cylinders on and off the trucks. | | | Products:Belzona ® 4111 (Magma Quartz) | | | Substrate:Concrete | | | Application Method:The application was carried out in accordance with Belzona Know-How System Leaflet FPA-1. | | | Belzona Facts:As this was new construction, a recess two feet wide and one quarter inch deep was left the entire length of the 20-foot long loading dock. After the concrete was fully cured, this area was cleaned and prepared with Belzona® 4911 (TX Conditioner). Belzona® 4111 (Magma Quartz) was then trowelled into place at the edge of the dock. The application was carried out based on the company’s previous experience with Belzona. | | | Photographs Description
- The recessed area of the dock
- The area taped and conditioned
- Belzona ® 4111 (Magma Quartz) trowelled into place
| |
| |