KHIA headerKnow-How in Action

VOL XXVI, NO 122

Belzona® Refurbishes Settlement Tank At Water Treatment Plant

 
 

Industry:

Water / Wastewater (WATR)

 
 

Application:

Floor Problem Areas (FPA)

 
 

Customer Location:

Surrey, UK

 
 

Application Date:

September 2010

 
 

Application Situation:

Damaged Primary Settlement Tank (PST)  at water authority site

 
 

Problem:

Due to freeze thaw damage and the constant weight of the separator arm, many areas of the running track had become damaged.

 
 

Products:

Belzona® 4131 (Magma-Screed) 

Belzona® 2211 (MP Hi-Build Elastomer)

 

Substrate:

Concrete

 
 

Application Method:

Application was carried out in accordance with Belzona Know-How System Leaflets FPA-1 & FPA-6. Timber formers were fixed to ensure accurate levels were achieved.

 
 

Belzona Facts:

This Belzona solution was chosen after many other repairs had failed. The Belzona® 4131 needed minimum cure time, minimum product quantity but offered maximum strength and abrasion resistance.

 
 

Photographs Description

  1. General view of the PST 
  2. Forming boards being used during application of the Belzona® 4131
  3. Expansion joint sealed with Belzona® 2211 
  4. Completed repair
 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
For more information about Belzona visit: www.belzona.com