| Spalled Concrete Vaults Are Reconstructed With Belzona | | | Industry:Oil & Gas (OILG) | | | Application:Tanks and Chemical Containment Areas (TCC) | | | Customer Location:Natural Gas Processing Plant in New Mexico,U.S.A. | | | Application Date:September 2001 | | | Application Situation:The entire secondary containment system of the plant consists of a small collection of vaults interconnected by 8-inch cast iron piping. | | | Problem:Over the years the different thermal expansion characteristics of the pipes caused the concrete surrounding pipes in the vault to spall. | | | Products:Belzona® 4141 (Magma Build)
Belzona® 4911 (Magma TX Conditioner) | | | Substrate:Concrete | | | Application Method:The application was carried out in accordance with Belzona Know-How System Leaflet TCC-9. | | | Belzona Facts:An EPA inspection was imminent. The plant chose Belzona to rectify their problems. The EPA inspection went well. | | | Photographs Description
- Some of the spalls were 8 inches deep
- Belzona® 4911 applied, application of Belzona® 4141 in progress
- Admiring the reconstructed unit
| |
| |