| Reduced Downtime, Costs Saved With Belzona | | | Industry:Buildings & Structures (BSTR) | | | Application:Tanks and Chemical Containment Areas (TCC) | | | Customer Location:Alumina plant - Texas USA | | | Application Date:November 2004 | | | Application Situation:Skimmer rail on a large clarifier - 630’ circumference | | | Problem:Erosion-corrosion and wear from motion of skimmer and seaside location. | | | Products:Belzona® 1121 (Super XL-Metal) | | | Substrate:Steel | | | Application Method:Application was carried out in accordance with a modified version of Belzona Know-How System Leaflet TCC-5. | | | Belzona Facts:Clarifier’s walls are approximately 50’ tall. The choice of Belzona® 1121 (Super XL-Metal) allowed for mixing of the material on the ground, with plenty of time for staff above to apply material. Welding would have been costly and time consuming. The Belzona Solution required only three days from start to finish. | | | Photographs Description
- The erosion-corrosion problem is evident
- Close-up view of the damage
- A 4" band around the circumference was repaired
- Completed repair
| |
| |