Application Situation:

Baler loader at a busy recycling paper mill.

 
 

Problem:

The concrete floor had begun to wear away due to abrasion from forklifts sliding bales into the conveyer. The steel was also excessively worn, causing a 2" lip for the bales to overcome. 

 
 

Products:

Belzona 4911 (Magma TX Conditioner)
Belzona 4131 (Magma-Screed)

 

Substrate:

Concrete and Steel

 
 

Application Method:

The application was carried out in accordance with a modified version of Belzona Know-How System Leaflet FPA-1. The surface was diamond ground to a 3-4 mil profile. Belzona 4911 was then applied to the area. Belzona 4131 was built up to the same steel level using a screed bar.

 
 

Belzona Facts:

The concrete would have needed to be cut out and poured, needing a week or more of labor and 28 days for full cure. The steel plate needed to be replaced, which would increase downtime. Belzona was able to complete the application in an 8 hour shutdown and have operations running 24/7 again.

 
 

Photographs Description

  1. Wear at loading point
  2. Suface preparation with diamond grinding
  3. Completed application    
 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
For more information about Belzona visit: www.belzona.com