| Rig Ballast System Repaired With Belzona | | | Industry:Oil & Gas (OILG) | | | Application:Valves, Pipes and Fittings (VPF) | | | Customer Location:International deep water drilling company - Egypt | | | Application Date:March 2002 | | | Application Situation:Pipes of the rigs ballast system. | | | Problem:Severely corroded and leaking pipes in many sections of the ballast system which threaten the safety of the rig. | | | Products:Belzona® 1121 (Super XL-Metal)
Belzona® 1291 (ES Metal) | | | Substrate:Carbon steel | | | Application Method:Application was carried out in accordance with Belzona Know-How System Leaflet VPF-11a. | | | Belzona Facts:The application was carried out while the rig was still in operation saving large sum of money and time in work-stoppage. The repairs protected the rig from serious problems affecting its safety. | | | Photographs Description
- General view of the rig
- Leakage of the ballast pipes of the rig
- Repair completed
- Another repair
| |
| |