Application Situation:

A 50-year-old Trane chiller located on the fifth floor of an office building in downtown Indianapolis. Not only would a replacement unit be extremely costly but a crane in a dense metropolitan area would further complicate the task.

 
 

Problem:

0.2 inch (5 mm) deep corrosion under insulation threatened to perforate the shell of this chiller. Condensation was traveling through an ineffective seam and pooling in a trough between two sections of foam insulation. This section of the shell experienced almost continual immersion and the attendant corrosion rates.

 
 

Products:

Belzona 1212

Belzona 1321 (Ceramic S-Metal)

 

Substrate:

Carbon steel cleaned to SSPC-SP 3

 
 

Application Method:

This application was performed using a modified version of Belzona Know-How System Leaflet VPF-1 & VPF-2.

 
 

Belzona Facts:

The Belzona repair was significantly faster and less expensive than replacement, did not require any down time, and most importantly actually prevents a reoccurrence of the same problem. This chiller is now better than new.

 
 

Photographs Description

  1. The application area after the insulation has been removed.
  2. The corrosion was concentrated along a linear trough formed by the rubber insulation.
  3. The shell fared back out with Belzona 1212.
  4. The finished repair ready for insulation.
 