Application Situation:

Four sets of stone steps at a hospital in Ontario Canada with large volume damage require cost effective and time critical repair.

 
 

Problem:

The steps had suffered severe damage and spalling caused by weathering, salt and freeze thaw effect. Large cracks and spalled stone were visible making the usage of the steps dangerous.

 
 

Products:

Belzona 4154 (Bulkfill Resin)

Belzona 4911 (Magma TX Conditioner)

Belzona 4131 (Magma-Screed)

Belzona 5231 (SG Laminate)

Belzona 4411 (Granogrip)

 

Substrate:

Stone

 
 

Application Method:

The damaged stone was removed back to a firm substrate. Due to the extent of the damage forms were created and Belzona 4154 was mixed with locally sourced aggregate and packed into place. Once cured the forms were removed and 1/4" of Belzona 4131 was applied over the stair treads and risers. To protect from further weathering and salt Belzona 5231 was applied over the steps with a high visibility yellow Belzona 4411 stripe at the edge of the step tread.

 
 

Belzona Facts:

Each set of steps took between 3 - 4 days to complete. This short timescale compared with traditional option of casting concrete meant that the hospital, its staff and patients experienced the minimal disruption possible.

 
 

Photographs Description

  1. Preparing the stone back to firm substrate
  2. Belzona 4154 being packed into former
  3. Application of Belzona 4131
  4. Finished application with Belzona 5231 and 4411
 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 