KHIA headerKnow-How in Action

VOL XXXI, NO 142

Belzona® Repairs Concrete After Bollard Removal

 
 

Industry:

Buildings & Structures (BSTR)

 
 

Application:

Floor Problem Areas (FPA)

 
 

Customer Location:

Shopping Centre, Bankstown, Australia

 
 

Application Date:

September 2004

 
 

Application Situation:

Damaged concrete in 48 areas where bollards were removed

 
 

Problem:

Removal of bollards left rough concrete substrate that was a trip hazard.

 
 

Products:

Belzona 4111 (Magma Quartz)

 

Substrate:

Concrete

 
 

Application Method:

Application was carried out in accordance with Belzona Know How System Leaflet FPA-1.  

 
 

Belzona Facts:

Ability to feather edge the Belzona 4111 enabled damaged areas to be quickly and simply levelled to eliminate trip hazard.

 
 

Photographs Description

1.Damaged concrete  

 

2.Conditioner applied  

 

3.Mixing Belzona 4111  

 

4. Applying Belzona 4111

 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
For more information about Belzona visit: www.belzona.com