Application Situation:

Cold room Floor

 
 

Problem:

The concrete around the entrance to the cold room had degraded and was causing access issues for pallet trucks. Previous attempts using proprietary repair products had also failed

 
 

Products:

Belzona 4111 (Magma Quartz)

 

Substrate:

Concrete

 
 

Application Method:

Application was carried out in accordance with Belzona System Leaflet FPA-1. The damaged concrete was removed back to a sound substrate before being rebuilt using the Belzona 4111 system which was feathered out to match up with the existing floor to provide a smooth level surface allowing easy access to the cold store

 
 

Belzona Facts:

Belzona 4111 was chosen for its high strength, performance, ability to be feather-edged and ease of application without the need for extensive structural works. Even when applied at cold temperatures there was no need for a long cure periods. This meant minimal disruption to the operation of the facility.

 
 

Photographs Description

1. The damaged floor 2. Close up of the damaged floor 3. Repairs underway 4. Repairs completed

 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
For more information about Belzona visit: www.belzona.com