KHIA headerKnow-How in Action

VOL XXXI, NO 168

Belzona® Repairs Holes With Bulkfill And Magma Quartz

 
 

Industry:

Buildings & Structures (BSTR)

 
 

Application:

Floor Problem Areas (FPA)

 
 

Customer Location:

Truck Part Manufacturer, NC, USA

 
 

Application Date:

June 2016

 
 

Application Situation:

Forklift traffic over control and expansion joint areas. 

 
 

Problem:

Due to continious forklift traffic holes had formed causing an issue in operations. 

 
 

Products:

Belzona 4111 (Magma-Quartz)

Belzona 4124 (Bulkfill) 

 

Substrate:

Concrete

 
 

Application Method:

The holes were cleaned out and filled with Belzona 4124. Once the holes were filled, it was top coated with Belzona 4111. FPA-1 System Leaflet was followed.

 
 

Belzona Facts:

Customer saved a lot of money because there is a tunnel under the areas where the repair was done. Concrete was an option, but it would be a long and costly repair, and would eventually fail again. It took 1 day of labor to do the work. This Belzona system was used because it is proven to work and last a long, long time.

 
 

Photographs Description

1. Preparing hole by removing loose material

2. After preparation

3. Bulkfilling with Belzona 4124

4. Top coated with Belzona 4111

 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
For more information about Belzona visit: www.belzona.com