| Belzona 7111 Aligns New Industrial Equipment | | | Industry:General Industry (GIND) | | | Application:Gaskets, Seals and Shims (GSS) | | | Customer Location:Manufacturing Plant, FL, USA | | | Application Date:August 2016 | | | Application Situation:New factory expansion needed chocking of three recently installed machinery. Leveling of the equipment was critical as well as preventing water with salt residues from penetrating beneath the bases. | | | Problem:On going construction on and around these equipment could not be stopped. Application had to be performed diligently and in harmony with other construction activities. The depth of the pours ranged between 1.5in to 3in. | | | Products:Belzona 7111 | | | Substrate:Steel base, concrete floor | | | Application Method:The application was carried out in accrodance with the Belzona Know-How System Leaflet GSS-12. | | | Belzona Facts:The application was carried out in less than a day with no interruption to the operation of the plant. | | | Photographs Description1. View of the gap needed to be filled.
2. Temporary wood dam and expansion joint.
3. Pouring of first layer.
4. After dam removal. | |
| |