FORMATION OF LOW PROFILE OIL CONTAINMENT TRAPS WITH BELZONA

KHIA ID: 660
Industry: General Industry (GIND)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Concrete
Customer Location: Mobile machinery manufacturer, Wales
Application Date: Ongoing since 1995
Products:

Belzona® 4111 (Magma-Quartz)


Problem: The problem is leaking oil (or chemicals) from machinery which seeps/spills/runs across the floor and into pedestrian walkways. This causes problems from both an environmental standpoint and also safety as oily floors equals slip hazards(multiplied by its proximity to machinery).
Photograph Descriptions
  1. Agreed area around machinery prepared
  2. Pipe removed Belzona® 4111 trap formed
  3. Finished job neat and effective
Application Situation
Production floor area around machinery. Creation of oil/chemical containment areas around machinery.
Application Method
The area where the containment trap is to be created is carefully chosen so as not to create a potential trip hazard. The application is carried out in accordance with a modified version of Belzona Know-How System Leaflet TCC-9. Two-inch plastic pipe sections, cut in half length wise are used to form the Belzona® 4111 containment dam.
Belzona Facts
Like all good Belzona applications it is done with minimal downtime, it is performed in-situ, it is cost effective, it certainly looks the part, it protects the environment and it addresses serious safety concerns.