BELZONA REPAIRS CRACKED STEEL TUNNEL

KHIA ID: 692
Industry: Buildings & Structures (BSTR)
Application: TCC-Tanks and Chemical Containment Areas (TCC)
Substrate: Steel
Customer Location: Cement Works, Usje, Macedonia
Application Date: September 2004
Products:

Belzona® 1221 (Super E-Metal)


Problem: A 700mm long crack had appeared on the weld joint of the steel walls
Photograph Descriptions
  1. Steel tunnel entrance 
  2. Crack in steel tunnel 
  3. Belzona® 1221 repair
Application Situation
Steel Tunnel
Application Method
Application was carried out in accordance with Belzona Know-How System Leaflet ENC-1.
Belzona Facts
The customer had tried to apply Silicone under the crack but it had failed within a month. This Belzona solution was designed to be a temporary solution to last 3 months until the plant was shut down when a weld repair could be carried out. The customer was very pleased with the outcome and the costs which were saved through not having to shut the plant down earlier then planned.