| Multiple Belzona Repairs To 72" Diameter Steel Pipe Embedded In Concrete | | | Industry:Power (POWR) | | | Application:Valves, Pipes and Fittings (VPF) | | | Customer Location:Nuclear Power Plant in New Jersey | | | Application Date:February 1996 | | | Application Situation:Service water system piping (condenser outlet pipe to cooling tower) | | | Problem:The 72" diameter steel pipe embedded in concrete was corroded and had developed through wall leaks. | | | Products:Belzona® 1311 (Ceramic R-Metal)
Belzona® 1321 (Ceramic S-Metal)
Belzona® 2111 (D&A Hi-Build Elastomer)
Belzona® 4111 (Magma-Quartz) | | | Substrate:Carbon steel (ASTM A283 grade C) | | | Application Method:Application was carried out in accordance with Belzona Know-How Leaflets VPF-1, VPF-2 and FPA-6. | | | Belzona Facts:The Belzona repair saved four additional outage days over alternative repairs saving an estimated $4 million. | | | Photographs Description
- View of the eroded pipe before work commenced
- Completed application to steel pipe
- Overall view of repair area showing patch repairs to concrete pipe and application to steel pipe in background
| |
| |