Belzona® Repairs Concrete Footing

 
 

Industry:

Buildings & Structures (BSTR)

 
 

Application:

Tanks and Chemical Containment Areas (TCC)

 
 

Customer Location:

Construction company, Slovakia

 
 

Application Date:

2006

 
 

Application Situation:

The concrete footing of a cutting machine in a large workshop.

 
 

Problem:

The footing was damaged by impact, this caused instability on the machine which meant it could not be used. 

 
 

Products:

Belzona 4111 (Magma-Quartz)

 

Substrate:

Concrete and Steel Reinforcement

 
 

Application Method:

Application was carried out in accordance with Belzona Know-How System Leaflet TCC-9.

 
 

Belzona Facts:

The Belzona concrete reapair allowed the machinery to be back online in only 4 days, compared to the possible 28 day cure time for concrete. The Belzona materials also have greater impact resistance to protect from future damage. 

 
 

Photographs Description

1. Destroyed concrete footing.

2. Belzona 4911 (TX Conditioner) application

3. Repair in progress

4. Belzona 4111 used to rebuild the base

 