KHIA headerKnow-How in Action

VOL XXII, NO 17

Coal Conveyer Repaired With Belzona® Elastomer

 
 

Industry:

Power (POWR)

 
 

Application:

Solids Handling Machinery (SHM)

 
 

Customer Location:

Power Plant, Missouri

 
 

Application Date:

2007

 
 

Application Situation:

A coal belt feeding coal from the coal yard to the plant.

 
 

Problem:

The belt had delaminated and lost the top two plys in areas. Plant officials worried that the belt integrity was in jeopardy due to the extensive damage.

 
 

Products:

Belzona® 2111 (D&A Hi-Build Elastomer)

Belzona® 9341 (Reinforcement Tape)

 

Substrate:

Rubber

 
 

Application Method:

Belt was repaired in accordance with Belzona Know-How System Leaflet SHM-1.

 
 

Belzona Facts:

Belzona products were on-site quickly and the repair was completed in a matter of hours. This saved the plant precious down time and money.

 
 

Photographs Description

  1. Belt damage
  2. Another view of the damaged area 
  3. Application underway with reinforcement tape being embedded in elastomer 
  4. Completed repair
 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
For more information about Belzona visit: www.belzona.com