Demonstrated Longevity in an FGD Repair

KHIA ID: 892
Industry: Power (POWR)
Application: VPF-Valves, Pipes and Fittings (VPF)
Substrate: FRP - Fiber Reinforced Polymer
Customer Location: Coal-Fired Power Plant - Cumberland City, Tennessee USA
Application Date: November 2005
Products:

Belzona® 5891 (HT Immersion Grade)

Belzona® 1391 (Ceramic HT)


Problem: Lime slurry from the four spray levels above had caused an existing polyurea coating to fail exposing the relatively soft FRP piping to the erosive forces of the lime slurry. Should the piping become holed, side streams would decrease the overall scrubbing efficiency resulting in increased operating costs.
Photograph Descriptions
  1. Exterior of the FGD at the spray level 
  2. Severely damaged FRP pipe caused by lime slurry 
  3. Completed Belzona application to one of six lime slurry header pipes 
  4. Belzona repair after seventeen months in service
Application Situation
Flue gas desulfurization scrubber operating at 200°F (93°C) comprised of five spray levels each with six lime slurry pipes.
Application Method
Belzona® 5891 and Belzona® 1391 were applied in accordance with a modified Belzona Know-How System Leaflet VPF-2.
Belzona Facts
Replacement of existing tapered FRP piping would have required an unacceptably long lead time and was considered prohibitively expensive. Belzona was selected because the repair can be conducted quickly and inexpensively in situ while providing the required abrasion, temperature, and chemical resistance.