KHIA headerKnow-How in Action

VOL XXV, NO 85

Belzona Protects Power Station Chimney Stack

 
 

Industria:

Power (POWR)

 
 

Áreas Know-How:

Wall Problem Areas (WPA)

 
 

Cliente / ubicación:

Powerstation, Zambrow, Poland

 
 

Fecha de aplicación:

2004

 
 

Situación de aplicación:

Power Station Chimney Stack

 
 

Problema:

The concrete had become detiorated from the locally generated fumes and required protection.

 
 

Productos:

Belzona® 5151 (Hi-Build Cladding)

 

Substrato:

Concrete

 
 

Método de aplicación:

The application was carried out in accordance with a modified Belzona Know-How System Leaflet WPA-2. To reduce disruption Rope Access technicians were used to complete the application.

 
 

Hechos Belzona:

In this particular case, the client required a blue/grey coating to meet their corporate needs. The Belzona® 5151 was modified to match the colours without deteriorating the performance of the coating which provides excellent protection whilst maintaining good appearance through its self cleaning properties.

 
 

Descripciones de fotografías

  1. Before application
  2. Application via rope access
  3. Close up of completed application
  4. General view of the protected stack
 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
Para obtener más información acerca de los productos Belzona visite: www.belzona.com