KHIA headerKnow-How in Action

VOL XV, NO 16, ELITE

A Cost Effective Solution To Severe Pitting - 11 Years Later: Perfect

 
 

Industria:

Oil & Gas (OILG)

 
 

Áreas Know-How:

Heat Exchangers (HEX)

 
 

Cliente / ubicación:

Gas plant - Alberta, Canada

 
 

Fecha de aplicación:

May 1990

 
 

Situación de aplicación:

Amine reboiler heat exchanger

 
 

Problema:

Severe pitting at froth line top and side walls.

 
 

Productos:

Belzona® 1311 (Ceramic R-Metal)

Belzona® 1321 (Ceramic S-Metal)

 

Substrato:

Carbon steel

 
 

Método de aplicación:

The application was carried out in accordance with Belzona Know-How System Leaflet HEX-3.

 
 

Hechos Belzona:

The Belzona System was more cost effective than the alternative of a metalizing spray weld repair. The repair has held up and the heat exchanger is still in operation, 11 years later.

 
 

Descripciones de fotografías

  1. Amine Reboiler
  2. Grit blasted, surface checked for impurities and salts
  3. Application of Belzona® 1311 and Belzona® 1321 completed
  4. Inspected one year later. Scaling of chemicals used in the process, when scraped off, revealed Belzona application was still in excellent condition.
 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 
Para obtener más información acerca de los productos Belzona visite: www.belzona.com