| Belzona Seals Skylights Over Production Hall | | | Industry:Buildings & Structures (BSTR) | | | Application:Roof Problem Areas (RPA) | | | Customer Location:Machinery plant, Slovakia | | | Application Date:2006 | | | Application Situation:Skylights in the roof of production hall | | | Problem:Corrosion of steel frame and rubber seal degradation on the skylights, caused by the effects of weather, was allowing rainwater to leak directly into the production hall creating safety issues and damage of interior machinery. | | | Products:Belzona® 3111 (Flexible Membrane) | | | Substrate:Glass & Steel | | | Application Method:Application was carried out in accordance with Belzona Know-How System Leaflet RPA-3. A fully reinforced Belzona® 3111 system was applied to bridge over the glazing bars and seal onto the glass. | | | Belzona Facts:To replace the rubber seals would take a long time and expose the interior to the full effects of the weather as well as interfering with production below. Repairs using the Belzona system was completed in 5 days without any disruption to the production process. | | | Photographs Description
- Skylights on the production hall
- Corrosion of steel frame
- Application in progress
- The skylights in "as new" condition
| |
| |