| Belzona® Prevents Leaks Into Electrical Room | | | Industry:Buildings & Structures (BSTR) | | | Application:Roof Problem Areas (RPA) | | | Customer Location:Hotel Chain, Vancouver, BC, Canada | | | Application Date:October 2009 | | | Application Situation:A leak had developed between the brick wall and the parking garage floor. | | | Problem:The leak was over the hotel electrical room causing periodic power disruptions. | | | Products:Belzona 3121 (MR7 Membrane) | | | Substrate:Brick and Concrete | | | Application Method:Application was carried out using a modified version of Belzona System Leaflet RPA-1. The area along the wall and concrete floor was ground with a Vac-grinder to ensure a good surface for bonding beforec applying the Belzona 3121 system. | | | Belzona Facts:This use of Belzona 3121 allowed for a quick turn around and minimal disruption to the hotel vehicle traffic in the area. | | | Photographs Description1. Surface preparation underway 2. The area was masked off before the 1st coat of Belzona 3121 was applied 3. A 2nd coat of Belzona 3121 was applied along with reinforcing sheet to ensure that the gap was adequately bridged. A 3rd coat was applied to complete the application. | |
| |