Water treatment plant, Tarbert, Scotland

 
 

Application Date:

May 2016

 
 

Application Situation:

Running track on two concrete clarifiers. 

 
 

Problem:

Running track on top of wall for distributor arm had been experiencing damage. The distributor wheels had caused impact & abrasion damage over time. Coupled with freeze/thaw, this had seriously damaged the substrate. Only a limited shutdown window was available for the repair. 

 
 

Products:

Belzona 4131 (Magma-Screed)

 

Substrate:

Concrete

 
 

Application Method:

Application was carried out in accordance with Belzona Know-How System Leaflet FPA-1.

 
 

Belzona Facts:

Using Belzona 4131, a repair could be completed in a fraction of the time it would take to knock down the clarifier walls & rebuild them. Belzona 4131's chemical & impact resistance will also stop the original problem from re-occurring.

 
 

Photographs Description

  1. The two clarifiers before work started
  2. Damage caused by the bridge wheel
  3. Belzona 4131 applied to the top of the wall
  4. Completed application
 