WASTEWATER CLARIFIER REPAIRS COMPLETED QUICKLY WITH BELZONA
Industry: Water / Wastewater (WATR)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Concrete
Customer Location: Water treatment plant, Tarbert, Scotland
Application Date: May 2016
Products:
Belzona 4131 (Magma-Screed)
Problem: Running track on top of wall for distributor arm had been experiencing damage. The distributor wheels had caused impact & abrasion damage over time. Coupled with freeze/thaw, this had seriously damaged the substrate. Only a limited shutdown window was available for the repair.
Photograph Descriptions
- The two clarifiers before work started
- Damage caused by the bridge wheel
- Belzona 4131 applied to the top of the wall
- Completed application
Application Situation
Running track on two concrete clarifiers.
Application Method
Application was carried out in accordance with Belzona Know-How System Leaflet FPA-1.
Belzona Facts
Using Belzona 4131, a repair could be completed in a fraction of the time it would take to knock down the clarifier walls & rebuild them. Belzona 4131's chemical & impact resistance will also stop the original problem from re-occurring.