WASTEWATER CLARIFIER REPAIRS COMPLETED QUICKLY WITH BELZONA

KHIA ID: 6093
Industry: Water / Wastewater (WATR)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Concrete
Customer Location: Water treatment plant, Tarbert, Scotland
Application Date: May 2016
Products:

Belzona 4131 (Magma-Screed)


Problem: Running track on top of wall for distributor arm had been experiencing damage. The distributor wheels had caused impact & abrasion damage over time. Coupled with freeze/thaw, this had seriously damaged the substrate. Only a limited shutdown window was available for the repair. 
Photograph Descriptions
  1. The two clarifiers before work started
  2. Damage caused by the bridge wheel
  3. Belzona 4131 applied to the top of the wall
  4. Completed application
Application Situation
Running track on two concrete clarifiers. 
Application Method
Application was carried out in accordance with Belzona Know-How System Leaflet FPA-1.
Belzona Facts
Using Belzona 4131, a repair could be completed in a fraction of the time it would take to knock down the clarifier walls & rebuild them. Belzona 4131's chemical & impact resistance will also stop the original problem from re-occurring.