Kerbs Fixed In Place With Belzona

 
 

Industry:

Buildings & Structures (BSTR)

 
 

Application:

Floor Problem Areas (FPA)

 
 

Customer Location:

Shopping centre, Brisbane, Queensland, Australia

 
 

Application Date:

June 2013

 
 

Application Situation:

Shopping Centre car Park

 
 

Problem:

Delivery of some shipping containers carrying tools and equipment for the refurbishment of the centre had caused damage to the demarcation kerbs around the car park.

 
 

Products:

Belzona 4111 (Magma Quartz)

 

Substrate:

Concrete

 
 

Application Method:

Application was carried out in accordance with Belzona System Leaflet FPA-11. The damaged sections of kerb were removed to allow the substrate to be cleaned and prepared before bonding the original kerbs back into place using the Belzona 4111 system.

 
 

Belzona Facts:

Belzona 4000 series products were chosen for their high strength, durability, ease of use and fast curing properties which allowed for the repairs to be carried out quickly using the original kerbs without the need for extensive reconstruction and only minimal disruption to traffic flow.

 
 

Photographs Description

1. The damaged/missing kerbs 2. Belzona 4111 applied to underside of kerb  3. Belzona 4111 applied to floor prior to refitting the kerb  4. Kerbs permanently back in position

 
Case study pic one

 

 
 Case study pic two

 

 
 Case study pic three

 

 
 Case study pic four

 

 
 