KERBS FIXED IN PLACE WITH BELZONA
Industry: Buildings & Structures (BSTR)
Application: FPA-Floor Problem Areas (FPA)
Substrate: Concrete
Customer Location: Shopping centre, Brisbane, Queensland, Australia
Application Date: June 2013
Products:
Belzona 4111 (Magma Quartz)
Problem: Delivery of some shipping containers carrying tools and equipment for the refurbishment of the centre had caused damage to the demarcation kerbs around the car park.
Photograph Descriptions
1. The damaged/missing kerbs 2. Belzona 4111 applied to underside of kerb 3. Belzona 4111 applied to floor prior to refitting the kerb 4. Kerbs permanently back in position
Application Situation
Shopping Centre car Park
Application Method
Application was carried out in accordance with Belzona System Leaflet FPA-11. The damaged sections of kerb were removed to allow the substrate to be cleaned and prepared before bonding the original kerbs back into place using the Belzona 4111 system.
Belzona Facts
Belzona 4000 series products were chosen for their high strength, durability, ease of use and fast curing properties which allowed for the repairs to be carried out quickly using the original kerbs without the need for extensive reconstruction and only minimal disruption to traffic flow.