Belzona® Superwrap Allows Drilling To Continue

 
 

Industry:

Oil & Gas (OILG)

 
 

Application:

Ships and Offshore Structures (SOS)

 
 

Customer Location:

Azerbaijan

 
 

Application Date:

November 2017

 
 

Application Situation:

A platform off the coast of Baku had to stop drilling due to wall loss on the HP mud lines. The problem areas were on 3 bend sections.

 
 

Problem:

Due to long lead time fabricating new sections of pipe, Belzona SuperWrap was used to reinstate the required strength to keep the high pressure lines in operation for at least 1 year.

 
 

Products:

Belzona SuperWrap II

 

Substrate:

ASTM A 519 Gr 4130

 
 

Application Method:

As per Belzona SuperWrap training

 
 

Belzona Facts:

Drilling needed to commence immediately and due to long lead time to replace the pipe sections, Belzona SuperWrap was able to give the required up time.

 
 

Photographs Description

1. View of Pipe before 21 wraps

2. View of Pipe before 12 wraps

3. View of SuperWrap repair: 21 wraps

4. View of SuperWrap repair: 12 wraps

 