Belzona SuperWrap Allows Drilling to Continue

KHIA ID: 7630
Industry: Oil & Gas (OILG)
Application: SOS-Ships and Offshore Structures (SOS)
Substrate: ASTM A 519 Gr 4130
Customer Location: Azerbaijan
Application Date: November 2017
Products:

Belzona SuperWrap II


Problem: Due to long lead time fabricating new sections of pipe, Belzona SuperWrap was used to reinstate the required strength to keep the high pressure lines in operation for at least 1 year.
Photograph Descriptions

1. View of Pipe before 21 wraps

2. View of Pipe before 12 wraps

3. View of SuperWrap repair: 21 wraps

4. View of SuperWrap repair: 12 wraps

Application Situation
A platform off the coast of Baku had to stop drilling due to wall loss on the HP mud lines. The problem areas were on 3 bend sections.
Application Method
As per Belzona SuperWrap training
Belzona Facts
Drilling needed to commence immediately and due to long lead time to replace the pipe sections, Belzona SuperWrap was able to give the required up time.