Application Situation:

Support structure (sub frame) for Temporary Living Quarters on Oil Rig.

 
 

Problem:

New accommodation needed to be installed, however, the client was concerned about the problems associated with welding the framework feet to the deck.

 
 

Products:

Belzona® 5811 (Immersion Grade)
 

Substrate:

Carbon steel

 
 

Application Method:

The application was carried out in accordance with a modified version of Belzona Know-How System Leaflet GSS-9.

 
 

Belzona Facts:

Due to the extended time after alignment/sealing to the bonding phase nitrogen was used to prevent flash rusting in the void to be filled with the Belzona® 5811. To combat the very cold conditions in the North Sea, January (0°C) heat blankets were used to allow the works to be completed.

 
 

Photographs Description

  1. Lowering of sub frame into position and alignment.
  2. Bonding application completed.
  3. Accommodation Modules in position.
 