BELZONA BONDS FRAMEWORK TO OILRIG DECK
Industry: Oil & Gas (OILG)
Application: GSS-Gaskets, Seals and Shims (GSS)
Substrate: Carbon steel
Customer Location: Norwegian Oil Operator
Application Date: January 2004
Products:
Belzona® 5811 (Immersion Grade)
Problem: New accommodation needed to be installed, however, the client was concerned about the problems associated with welding the framework feet to the deck.
Photograph Descriptions
- Lowering of sub frame into position and alignment.
- Bonding application completed.
- Accommodation Modules in position.
Application Situation
Support structure (sub frame) for Temporary Living Quarters on Oil Rig.
Application Method
The application was carried out in accordance with a modified version of Belzona Know-How System Leaflet GSS-9.
Belzona Facts
Due to the extended time after alignment/sealing to the bonding phase nitrogen was used to prevent flash rusting in the void to be filled with the Belzona® 5811. To combat the very cold conditions in the North Sea, January (0°C) heat blankets were used to allow the works to be completed.
Module in place for 9 years weighing around 145 tonnes.