| Long Lasting Belzona Step Repair - Excellent After 20 Years | | | Industria:General Industry (GIND) | | | Áreas Know-How:Floor Problem Areas (FPA) | | | Cliente / ubicación:U.S. Air Force Base - Illinois U.S.A. | | | Fecha de aplicación:Summer 1984 | | | Situación de aplicación:Steps into busy headquaters building | | | Problema:Cracked steps allowed water to leak and pool under the steps where the main building transformer is located. Of secondary concern was the absence of slip protection on the step noses. | | | Productos:Belzona® 4111 (Magma-Quartz)
Belzona® 1321 (Ceramic S-Metal)
Belzona® 9211 (Supergrip Aggregate) | | | Substrato:Concrete | | | Método de aplicación:Application was carried out in accordance with Belzona Know-How System Leaflet FPA-8. | | | Hechos Belzona:All the steps and landings were rebuilt/coated with 1/4” of Belzona® 4111. Strips of Belzona® (Ceramic S-Metal) and coarse aggregate were applied for safety. Repouring of the steps would have been very expensive and most likely would have suffered the same problem after a period of time. After 20 years the steps and the non-skid are still in excellent condition. The photos were taken in April of 2004. | | | Descripciones de fotografías1. to 4. Various angles of the steps. | |
| |